Rice-lake CB-2 Concrete Batch Controller Version 2.0 Manuel d'utilisateur Page 12

  • Télécharger
  • Ajouter à mon manuel
  • Imprimer
  • Page
    / 14
  • Table des matières
  • MARQUE LIVRES
  • Noté. / 5. Basé sur avis des utilisateurs
Vue de la page 11
8 Installation/Operation Manual
2.3 Load Cells
The CB-2 comes pre-wired at the factory. Figure 2-4 shows the loadcell connections on the lower row.
Pin 1
+ SIG
- SIG
+ EXC
- EXC
+ SIG
- SIG
+ EXC
- EXC
Aggregate
Side
Cement Side
Figure 2-4. Terminal Blocks Load Cell Connection (Metered Water)
Table 2-2 lists the load cell connections for a CB-2 automated concrete batching system that contains two load
cells.
Table 2-2. Load Cell Connectors for Units with Two Load Cells (Metered Water)
Bottom Connector - Load Cells
Load Cell Connector Pin Number Signal
Load Cell 1
Aggregates
1 - EXE
2 + EXE
3 - SEN
4 + SEN
5 - SIG
6 + SIG
Load Cell 2
Cement
7 - EXE
8 + EXE
9 - SEN
10 + SEN
11 - SIG
12 + SIG
Vue de la page 11
1 2 ... 7 8 9 10 11 12 13 14

Commentaires sur ces manuels

Pas de commentaire