Rice-lake CB-2 Concrete Batch Controller Version 2.0 Manuel d'utilisateur

Naviguer en ligne ou télécharger Manuel d'utilisateur pour Échelles Rice-lake CB-2 Concrete Batch Controller Version 2.0. Rice Lake CB-2 Concrete Batch Controller Version 2.0 User Manual Manuel d'utilisatio

  • Télécharger
  • Ajouter à mon manuel
  • Imprimer
  • Page
    / 14
  • Table des matières
  • MARQUE LIVRES
  • Noté. / 5. Basé sur avis des utilisateurs
Vue de la page 0
CB-2
Automated Concrete Batching System
Version 2.0
Installation/Operation Manual
93603
Vue de la page 0
1 2 3 4 5 6 ... 13 14

Résumé du contenu

Page 1

CB-2Automated Concrete Batching SystemVersion 2.0Installation/Operation Manual93603

Page 2

6 Installation/Operation Manual2.1 Important Notes2.1.1 Two Power SourcesThe CB-2 requires two separate power sources to run. The power cord that cam

Page 3

Installation/Operation Manual - Installation 72.2 CB-2 Main Junction BlockThe CB-2 main junction box provides access for outside power to be brought

Page 4

8 Installation/Operation Manual2.3 Load CellsThe CB-2 comes pre-wired at the factory. Figure 2-4 shows the loadcell connections on the lower row.

Page 5

Installation/Operation Manual - Installation 9For units containing three load cells, the following table and diagram illustrate the load cell connect

Page 6

10 Installation/Operation Manual2.3.1 Serial CommunicationsThe CB-2 supports RS-232 communications and their connections are shown in Figure 2-6, bel

Page 9

ContentsAbout This Manual ...

Page 10

2 CB-2 Installation Manual6.4 Diagnostics . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

Page 11

Installation/Operation Manual - Safety 1About This ManualThis manual is intended for use by service technicians responsible for installing and servic

Page 12

2 Installation/Operation Manual1.0 IntroductionThe CB-2 is a versatile, efficient concrete batching control system ideal for ready-mix, central mix,

Page 13

Installation/Operation Manual - Introduction 3Front PanelThe 920i front panel, shown in Figure 1-1, consists of a 27-button keypad with a large backl

Page 14

4 Installation/Operation Manual1.2 Indicator OperationsThe CB-2 does not allow the 920i to execute any of its standard operations like Gross/Net, Uni

Page 15

Installation/Operation Manual - Installation 52.0 InstallationThis section explains the main junction box, load cell, digital I/O, and serial communi

Commentaires sur ces manuels

Pas de commentaire